Benier First Proofer BP
Your Price: | $0.00 * USD |
Item Number: | 25518 |
Manufacturer: | Benier |
Model No.: | First Proofer BP |
*Price Does NOT include cost of crating, shipping, delivery or installation.
Benier First Proofer BP
Power supply: 460V- 3ph-60Hz-Ground-Neutral or 208v-3ph-60hz-Ground-Neutral
*Other power supplies available; In some cases this will increase price
Capacity
Max. 2,250 pcs./hr.
Dough weights
min. 100 – max. 1,200 gr.
Flexibility in Operation:
-Possibility to discharge after every cycle, creating flexibility in proof time
-Frequency control to run the first proofer faster or slower
-Manually adjustable discharge chute
-Operation by means of integrated PLC with touch screen panel, for;
o Start - stop - reset
o Emergency circuit with potential free contacts
o Override function for emergency unloading of the proofer
o Fixed speed
o Suction fan ON/OFF
o A VPN connection via HOME2M to the PLC system must be available prior to the start-up
of the equipment for remote access and service
Easy cleaning and maintenance:
Improved modular design based on latest hygenic and cleaning requirements.
-Removable drawers in stainless steel
-Sliding collecting trays in the lower frame of the first proofer
-Hingeing panels in overhang in order to reach the swings and pockets easily
-Synthetic discharge box
-Stainless steel panels with 45º angle preventing flour and/or dust build-up
-Removable pockets
-Large sliding windows for clear visibility and accessibility to swings and pockets
High performance:
-In the transfer device (dough ball is positioned to next dough cup), accumulated dough balls are registered with a laser sensor unit
-Fan at infeed position prevents dough pieces sticking in the pockets directly after infeed
Benier service box: instruction videos to support you with installation, operation, maintenance and cleaning for a longer life cycle for your machine
|
|
|
|
|
Dimensions in In. |
Max. Proofing time (min) |
|||
Type |
Net loading (# of pcs) |
# of swings |
# of pockets per swing |
# of sections |
A |
B |
C |
1200 pcs/hr |
2000 pcs/hr |
BP8- 192N |
192 |
29 |
8 |
1 |
28.35 |
82.10 |
112.20 |
9,6 |
5,8 |
BP8- 240N |
240 |
35 |
8 |
1 |
28.35 |
82.10 |
112.20 |
12,0 |
7,2 |
BP8- 296N |
296 |
42 |
8 |
1 |
28.35 |
150.32 |
112.20 |
14,8 |
8,9 |
BP8- 384N |
384 |
53 |
8 |
2 |
55.40 |
140.63 |
112.20 |
20,0 |
12,0 |
BP8- 440N |
440 |
60 |
8 |
2 |
55.40 |
177.36 |
112.20 |
22,4 |
13,4 |
*Proofing time is depending on capacity and position of outfeed valve
Due to the fluctuating rate of the Euro we will be quoting these units on a needed basis. To receive a quote with pricing please click the “Get Quote” button now.